Six Sigma Yellow Belt Practice Test
Six Sigma Yellow Belt Improve & Control Phases Practice Questions
Improve & Control Phases makes up 9 of every 50 questions on a Tigertest Six Sigma Yellow Belt practice test. Here are 10 of the 36 questions on it, each with the answer and the reason.
Updated by the Tigertest team. Based on the ASQ CSSYB Body of Knowledge (2022). Original questions; 50 per test, weighted like the real exam, with a 70% readiness line. Not affiliated with ASQ.
1. What does the word kaizen mean in quality practice?
- A.Signal to move parts
- B.Small continual gains
- C.One large breakthrough change
- D.Error-proofing one step
Answer: B. Kaizen is the habit of steady, incremental improvement by everyone. A single large change is the opposite approach.
2. Who takes part in kaizen in a lean organization?
- A.Only senior managers
- B.Only outside consultants
- C.Only Black Belts
- D.Everyone, at every level
Answer: D. Kaizen relies on the people who do the work noticing and fixing problems every day, with leaders supporting them.
3. About how long does a kaizen blitz usually last?
- A.Three to five days
- B.Two full years
- C.Several months
- D.About one full shift
Answer: A. A kaizen blitz (kaizen event) is an intense, focused effort, usually three to five days, on one process or area.
4. What should happen right after a kaizen blitz ends?
- A.Start a new FMEA
- B.Close the process down for good
- C.Follow-up to keep the gains
- D.Return to the old layout
Answer: C. Gains from a short event fade unless owners follow up on open actions, update standards and check results.
5. Why does a kaizen blitz need preparation beforehand?
- A.So the event can run for months
- B.So staff can skip it
- C.Prep data and people
- D.So no changes are made
Answer: C. Because the event is short, the scope, baseline data, team and support must be lined up in advance.
6. In PDCA, what happens in the plan step?
- A.Choose a change and how to test it
- B.Study results against goals
- C.Make the trial change
- D.Roll out the change widely
Answer: A. Plan studies the problem, chooses a change and sets how its effect will be measured before anything is tried.
7. In PDCA, what happens in the do step?
- A.Write the final SOP
- B.Adopt it at once across every site
- C.Set the project budget
- D.Try the change on a small scale
Answer: D. Do carries out the planned change as a trial so its effect can be measured with little risk.
8. In PDCA, what happens in the act step?
- A.Form the project team
- B.Adopt, adjust or drop the change
- C.Collect the baseline data
- D.Brainstorm all the possible causes
Answer: B. Act uses what was learned: standardize the change if it worked, change it, or abandon it, then begin the next cycle.
9. Which quality leader is most often linked with spreading the PDCA cycle?
- A.Philip Crosby
- B.W. Edwards Deming
- C.Frederick Winslow Taylor
- D.Henry Ford
Answer: B. Deming taught the cycle, which he credited to Walter Shewhart, so it is also called the Deming or Shewhart cycle.
10. A trial change did not meet its goal. In PDCA, what comes next?
- A.Stop all improvement work
- B.Jump straight to the control phase
- C.Roll it out anyway
- D.A new cycle using the lessons
Answer: D. PDCA treats a failed trial as learning: the team adjusts its plan and runs the cycle again.
Practice all 36 improve & control phases questions, and the rest of the 200-question bank, in the free Six Sigma Yellow Belt training sets. Questions you miss come back until you have mastered them.
Start practicingFree to start. No account needed.